Wednesday, May 26, 2010

5th week

3 MAY 2010

8.15am-11.00am

Task: Update my weekly report for previous week (26/4 – 30/4).

Description: Compile the whole day report and add attachment including some inspection photos and some RFI documents.

11.00am-1.00pm

Task: Work inspection: Installation of cold water tank at level 6. Accompany Mr. Helmi.

Description: The thing that has been checked is to see whether there is any leakage on the tank. It is done by determining whether there is any water volume drop.

2.00pm-4.00pm

Task: Read mechanical services : Sanitary Plumbing

Description: The system will be designed based on a one pipe fully vented stack system. All soil waste water from the buildings shall be discharged to the external underground manholes complying with JPP requirement. The internal sanitary system shall be designed to dispose soil and waste from all plumbing fixtures, through a vented gravity piping system inside the building and discharge to external manholes. All the external manholes shall be connected and discharge to external public sewer system. Manholes shall be constructed of reinforced concrete base and walls of brickwork, complete with heavy duty access covers and frames.

4.30pm-5.15pm

Task: Update my daily report



4 MAY 2010

8.15am-10.00am

Task: Update the previous day daily report (Monday)

10.00am-1.00pm

Task: Attend weekly progress meeting between KLIACS and MAJU.

Description: From the meeting, Mr. chairman has told us that ITTBTS project is progressing up to 85% until now. The Testing and Commissioning (T&C) procedure will expected to begin on 15th May 2010 whereby the PMC need to check whether all the system installed in the building is functioning or not. Up until now, only ICT works are quite left behind (50%) because they are depending mostly on the power supply incoming but the ICT consultant,ORENDA has briefed in the meeting confidently that they have ready with all the installation and testing procedure. The project is expected to hand over earlier before the contract date ends.

2.00pm-4.00pm

Task: Study drawing : ACMV ducting installation

Description: I have studied the ACMV ducting drawing for level 2 & 3.

4.00pm-5.15pm

Task: Update my weekly report for the day



5 MAY 2010

8.15am-9.30am

Task: Update the previous day daily report (Tuesday)

9.30am-12.00pm

Task: Study drawing mechanical services for level 1

Description: There are several important rooms at level 1 which related to mechanical services. They are LPG room, Air-cond make up tank, oil interceptor tank, chiller plant room, wet riser tank, sprinkler water tank, fire pump room, and AWCS room.

2.00pm-3.00pm

Task: Retype ‘surat dokumen perubahan kerja’

Description: This letter is to be send to MOT.

3.00pm-4.30pm

Task: Inspection of material delivery (fire fighting services). Accompany Mr. Helmi. RFI no: FF 169/172/174/175.

Description:

1. Material delivery of 84kg FM200 gas cylinder c/w full accessories at MTB level 2, TMC room. FF/169.

2. Material delivery of cast iron gate valve at MTB level 1, store. FF/172.

3. Material delivery of DEMCO alarm bell 6” (150mm) D-102 at MTB level 1, store. FF/174.

4.30pm-5.15pm

Task: Staff meeting. 4th meeting for year 2010.

Description: The meeting objective is to update the project progress and related matters and as platform to discuss and resolve any project issues as well as team members’ related issues. We also welcoming the new staff(Mr. Shaili,ICT) and 2 new practical trainees(Mr. Hafiz,electrical and Miss Marsha,C&S).



6 MAY 2010

8.15am-9.30am

Task: Update my daily report for the previous day.

10.00am-12.00pm

Task: T & C briefing (Lifts and Escalators procedures)

Description: The briefing session has been chaired by Mr. Kamarudin(Site Facilities Manager). 2 SIGMA’s representatives are present to brief on how they are going to conduct the T&C procedure specifically for lifts and escalators services. They have come out with their checklist on what item need to be checked during the T&C period.

2.00pm-3.00pm

Task: Read mechanical services : Automatic Waste Collection System (AWCS)

Description: This system shall consist of central vacuum plant (includes high pressure fans, valves, compressors, etc.) fitters, control panels, sealed containers, pipeworks, fully vacuum load station (FVLS) and computer workstation. FVLS is proposed at 3 areas only which are Food court, F&B outlets and restaurants at level 4. All FVLS are connected by 400mm diameter G.I pipeworks to discharge waste in bags to the main collection centre.

3.00pm-4.30pm

Task: Inspection of control panel installation & Megger Test for sprinkler, wet riser, hose reel and pressurized hydrant system at MTB level 1, fire pump room & pressurized hydrant pump room. RFI no: FF/176 and FF/178

Description: For megger test, the minimum resistance value need to be achieved is 300MΩ. Thus, getting the higher value is much better. It shows that the cables are well insulated.

4.30pm-5.15pm

Task: Stamp received RFI

Description: The RFI are for architecture, landscape, and C&S works for tomorrow.



7 MAY 2010

8.15am-9.30am

Task: Update my previous day report (Thursday)

9.30am-11.00am

Task: Read Testing and Commissioning (T&C) procedure

Description: The purpose of doing T&C is to confirm and validate that the function of the equipments and systems provided under the project meet the design and contractual requirements and that the quality of various elements of construction works meet the performance specified under the contract. In T&C procedure, there are 4 important forms involved. They are T&C/Conformance Test Record, Non Conformance Report(NCR), Document Review Form and Inspection Report.

11.00am-12.00pm

Task: Read Taking Over procedure

Description: The forms involved in Taking Over procedure are Extension of Time Certificate, Defects List, Defects Liability Certificate, Taking Over Checklist and Taking Over certificate.

2.30pm-4.30pm

Task: Update my industrial training log book for week no. 4

4.30pm-5.15pm

Task: Update my daily report for the day