Sunday, May 9, 2010

3rd WEEK




19 APRIL 2010

8.15am-10.00am

Task: Hang mechanical shop drawing on drawing hanger (instructed by Mr. Kamarudin)

Description: Some drawings are Air Conditioning and mechanical ventilation (ACMV), lifts and escalators, sanitary plumbing, Automatic Waste Collector System (AWCS), fire protection, etc.

10.00am-11.00am

Task: Stick photos of steel bridge at the front office hall (instructed by Mr. Hisham)

Description: The photos are about the steel bridge installation including its beams, hanger, ribs and stringer.

11.00am-1.00pm

Task: Capture photos of steel bridge from MTB view (Accompany Mr. Rosanizan)

Description: The steel bridge is used to link from MRR2 to MTB.

2.00pm-3.30pm

Task: Fill in training log book for previous week (2nd week)

3.30pm-5.15pm

Task: Work inspection (Accompany Mr. Helmi): Insulation of chilled water pipe for AHU at Zone D (L3-6,L3-5,L3-4,L3-3,L3-2,L3-1). RFI no: MV/172. RFI status: A.

Description: The insulation material is Polyurethane (PU) fiber. Insulation is used to lower the heat transfer flow rate from the surrounding to the inner pipe.



20 APRIL 2010

8.15am-9.30am

Task: Update the previous day daily report (Monday)

9.30am-11.00am

Task: Log my weekly report in industrial training file (F05).

Description: This file is for KLIA Holdings to keep record their trainees reports and data.

11.00am-1.00pm

Task: Read the mechanical works : Cold Water plumbing

Description: In summary, the incoming water is tapped from external mains and directly at level 1 suction tank where the suction tank is of FRP material. The water from suction tank is pumped via risers to roof storage tanks using vertical in line booster pump sets c/w water hammer arrestors.

2.00pm-4.00pm

Task: Work inspection (Accompany Mr. Helmi)

1.Installation of sprinkler, main & range pipe. RFI no: FF/166

2.Installation of hydrant pump sets. RFI no: FF/167

Description:

1.The installation of sprinkler is at MTB, level 1 G/L X0-X9,Y0-Y4. The sprinkler pipe include main pipe, distribution pipe and range pipe. All those pipes have different sizes (40mm,32mm and 25m). This is to obtain the desired pressure required.

2.The installation of hydrant pump sets is at MTB, level 1 (Pressurized hydrant pump room). The hydrant pump sets is used to provide water supply for the fire fighting system.

4.00pm-5.15pm

Task: Update my daily report for Tuesday.


21 APRIL 2010

8.15am-9.00am

Task: Log RFI for architecture works. (Assist Mr. Azir)

9.00am-10.00am

Task: Capture perspective photos at Zone A, B and C for monthly progress report. (Accompany Mr. Rosanizan)

10.00am-12.00pm

Task: Update my daily report for previous day events (Tuesday).

2.00pm-4.00pm

Task: Go to KLIA HQ (Bangi) to collect ITTBTS letters and then to MOT(Putrajaya) to stamp received accident report. (Accompany Mr. hafiz)

4.00pm-5.15pm

Task: Read mechanical services : smoke spill system

Description: Briefly, the system is provided for level 2, 3, and 4 to enhance safety of occupants and fire fighters during fire situation. The areas covered are air conditioning area, departure platform and main concourse drop off area. Dedicated smoke spill ductwork and fans are provided for each compartment to perform the smoke spill function.

22 APRIL 2010

8.15am-9.00am

Task: Update my daily report for previous day (Wednesday)

9.00am-10.00am

Task: Retype letter of material approval (Assist Mr. Hafiz)

Description: The letters are about Multiplex Expansion Joint (ref. no. MHSB/CD/ITTBTS/S/4884) and Sewerage Treatment Plant (ref. no. MHSB/CD/ITTBTS/S/4829).

10.00am-11.30am

Task: Inspection of material delivery for control panel unit and pump sets at MTB, level 1. (Accompany Mr. Helmi) RFI no: MW/038.

Description: The control panel is to be installed at the hydrant pump room.

11.30am-1.00pm

Task: Update my industrial training blog.

2.00pm-3.00pm

Task: Retype the audit findings document for Control of Non Conforming Works, Progress Payment and Project Progress Reporting. (Instructed by Mr. Kamarudin)

3.00pm-5.15pm

Task: Work inspection for lift no. 6, 7, and 10 at MTB level 2,3,4,5 and 6. (Accompany Mr. Helmi) RFI no: EV 079/080/081.

Description: The inspection is for the installation of guide rails, landing door and landing sills at the lift car.


22 APRIL 2010

8.15am-9.30am

Task: Update my daily report for previous day (Thursday)

9.30am-12.00pm

Task: Read mechanical services regarding Air Conditioning System Description

Description: From my reading, Air-conditioning unit (FCU & AHU) shall be thermal insulated complete with fan motors, drive guards, cooling coils, drain pan and pipes, air filters, dace and bypass dampers. Filter offered in the air conditioning unit shall be two stage filter with minimum efficiency of 90%-95% to ASHRAE standard 52-76. Piping material for chilled water shall be of medium grade – Black Steel pipes to BS 1387. Chilled water pipe should also be pre-insulated with rigid polyurethane foam and protected by an outer metal jacket.

2.30pm-4.00pm

Task: continue reading the Air Conditioning System

Description: The ductwork used for air conditioning shall be fabricated from an acceptable quality of galvanized iron sheets using seams, slip joint and other standard practices recommended by SMACNA. For the server rooms, they are provided with 24 hour air conditioning system. It is achieved by coupling central air conditioning system with air cooled split unit. Air cooled split units shall be connected with essential power supply.

4.00pm-5.15pm

Task: Update my industrial training blog.