12 APRIL 2010
8.15am-1.00pm Task: Doing 1st weekly report to submit to Human Resource of KLIACS. Description: The report consists of daily works completed for every day. 2.00pm-4.00pm Task: Work inspection (Megger Test) at Zone D, level 1(AWCS Plant Room). Accompany Mr. Helmi (Mechanical Engineer) RFI no: WS/054. RFI status : A Description: Megger Test is a test of the insulation properties of such things as electric wiring, motor windings and high power antenna mounts. The contractor have used insulation tester to see if it is shorted to ground in any way. The megger uses much higher voltages to check resistance than a normal Volt-ohm meter. The minimum resistance need to satisfy is 1Mohm whereas the test result obtained is above 400Mohm in average. 4.00pm-4.30pm Task: Assemble plan hanger Description: Plan hanger is used to hang the drawings sheet. There are 4 types of drawings which are Design drawings, working drawings, As built drawings and Shop drawings. 4.30pm-5.15pm Task: Read sample weekly report of previous trainee.
8.15am-10.00am Task: Update the previous day daily report (Monday) 10.00am-1.00pm Task: Attend weekly progress meeting between KLIACS and MAJU. Description: This kind of meeting is conducted once in a week (usually Tuesday). Generally, the meeting starts off with MAJU representative presenting the overall progress of the project whether it is ahead or delay by comparing the actual and schedule percentage. Then, the meeting proceeds with MAJU representatives presenting the QA/QC report and HSSE report. Finally, the meeting continues with discussing the previous week minute of meeting to check whether the task to be done have been achieved or not. 2.00pm-3.00pm Task: Read the mechanical works : Fire protection services Description: There are several scopes covered in fire protection services for instances sprinkler system, wet riser system, pressurized hydrant system, hose reel system, fixed CO2 extinguishing system and etc. 3.00pm-5.15pm Task: Read and retype the inception phase document. Description: The inception phase of any project begins with determining the type of project that the Project manager will handle. KLIACS will be the Project management Consultant (PMC) which is on behalf of the client (MOT) to deal with the main contractor (MAJU). The PM will then propose his Project Team Organization (PTO) to the HQ to assist him in completing the job as PMC.
8.15am-10.00am Task: Update the previous day daily report (Monday) 10.00am-12.00pm Task: Work inspection: installation of smoke curtain at Zone D level 3 and 4. Accompany Mr. Helmi. RFI no: FF/157 & FF/158. RFI status : A Description: The smoke curtain used is partial and fully closed smoke curtain. It will automatically roll down whenever fire occurs. It will then cover the burning area from receiving more oxygen so that the fire can be stopped. 12.00pm-1.00pm Task: Check the reference no. of signage drawing to match with the report submitted. 2.00pm-4.00pm Task: Assist Mr. Azir to log the RFI documents for the architecture works. 4.00pm-5.15pm Task: Stamping the received RFI for the next inspection. The RFI are for architecture, landscape and C&S works.
8.15am-9.30am Task: Read and compile monthly progress report. 9.30am-10.00am Task: Study floor plan for level 1-6 to get familiar with each location. 10.00am-12.00pm Task: Work inspection: installation of 12.2m x 6.1m x 2.4m pressed steel tank c/w water level indicator, internal & external ladder, vent cowl & manhole access at Zone D, level 1(pressurized hydrant pump room). Accompany Mr. Helmi. RFI no: FF/156. Status: cancel RFI due to some amendments on the work done. 2.00pm-3.30pm Task: create my industrial training blog. http://www.hakeemtraining.blogspot.com Description: This is one of assessment in my industrial training course. It will carry 10% for the marks. The blog will include my daily works at KLIACS. It is sort of an electronic diary. 3.30pm-5.15pm Task: Megger test for Control Panel of AHU, FCU, kitchen exhaust, fresh air fan & exhaust fan at Zone D, level 5 & 6. Accompany Mr. Helmi. RFI no: MV/168. Status: partially done and postpone to the next day due to absence of the contractor. Description: This test is to check for continuity of the connecting wire. The tester device will indicate 0 value for which the connection is continuous. |
8.15am-9.00am Task: update my industrial training blog for the first post 9.00am-10.00am Task: Read mechanical services regarding lift and escalator service Description: To summarize, there will be 11 nos. motor-roomless passenger lifts for terminal buildings, 2 nos. passenger lifts with motor room for arrival platform, 2 nos. motor-roomless passenger lifts for link bridge, 16 nos. escalators for terminal building, 2 nos. escalators for link bridge. 10.00am-12.00pm Task: Assist Mr. Rosanizan to capture the progress photos at Zone A, B, C, D, E, and F. Description: These photos are to be attached in the ITTBTS monthly progress report to show the updates for each zone. 2.30pm-4.30pm Task: read mechanical services regarding LPG supply system Description: In summary, the gas manifold come with 50 kg gas cylinders. It is automatic change-over duty and standby banks of cylinders. The gas pipework shall include pressure regulators, valves, emergency shut off valves, pressure gauge and all necessary fittings. 4.30pm-5.15pm Task: Update my weekly training report for Friday events. |