Wednesday, May 26, 2010

4th Week

26 APRIL 2010

8.15am-9.30am

Task: Update my daily report for previous day (Monday)

9.30am-11.00am

Task: Read mechanical services : sprinkler system

Description: In summary, the hazards class shall be OH III-45M to cover for the entire terminal building. Dedicated pump sets will be provided. The pumps will connect via alarm check valves and installation control valves to individual sprinkler heads. The whole system will be permanently charged with water and will automatically operate upon a pressure drop within the system on activation of the sprinkler head by heat.

11.00am-1.00pm

Task: Read mechanical services : wet riser system

Description: In summary, the system is served by a pump set with 1 duty, 1 standby and 1 jockey located at fire pump room. All pumps shall be electrically driven centrifugal type and provided with emergency genset supply via fire-rated cable. The landing valves shall be located at a height of 1 meter above floor slab on each level (ready for firemen’s use). Canvas hose of 65 mm diameter shall be provided in a hose cradle and located together with each landing valve.

3.00pm-4.30pm

Task: Work inspection (Accompany Mr. Helmi)

1. Installation of hydrant pump sets c/w fittings, valves, and all necessary accessories at MTB, level 1 (Pressurized hydrant pump room) RFI no: FF/167

2. Installation of wet riser pump sets and hose reel pump sets c/w fittings, valves and all necessary accessories at MTB, level 1 (Fire pump room) RFI no: FF/168

4.30pm-5.15pm

Task: Update my daily report.



27 APRIL 2010


8.15am-10.00am

Task: Update the previous day daily report (Tuesday)

10.00am-11.00am

Task: Read mechanical services : Hose reel system

Description: The system is located at level 1 fire pump room to give protection for the terminal building. The system is served by electrical hose reel pump set consist of 1 duty and 1 stand by located within the fire pump room. It is centrifugal type and the flow is 2.27 L/s. Individual 30m length hose c/w drum and nozzle will be strategically located at every hose reel compartment to provide 30m radius of coverage. Pipe material for above ground shall be G.I class ‘C’ whereas for underground, the same material is been used but it is coated with bituminous material.

11.00am-12.00pm

Task: Short briefing for trainees about ITTBTS project. The briefing is more on introducing the project progress up until now and delegate the job based on our trade. (Instructed by Mr. Fadzil, Project Manager)

3.00pm-4.30pm

Task: Check material delivery for ductworks, air filters, diffusers and grill at MTB, level 1. Accompany Mr. Helmi. RFI no: MV/175

4.30pm-5.15pm

Task: Update my daily report.



28 APRIL 2010

8.15am-9.30am

Task: Update my daily report for previous day (Wednesday)

10.00am-12.00pm

Task: Check drawing for lift, escalators and sprinkler system (level 1). Assist Mr. Helmi.

Description: The checking is done by comparing the RFI received to the drawing (for lifts, escalators, and sprinkler). We have highlighted the areas for which the installations have been done. This is to ensure we know the mechanical works progress up until now.

2.00pm-3.00pm

Task: Read mechanical services : Portable fire extinguisher

Description: Portable ABC (9Kg type): Dry powder fire extinguisher shall be located at strategic positions along escape which are routes, lobbies, corridors, and general storage areas. Portable CO2 (2.2Kg type): Fire extinguishers shall be provided for all areas under potential electrical fire such as main switch room, genset room and pump rooms.

3.00pm-5.15pm

Task: Go to MOT to hand in the site car (PERDANA). Accompany Mr. Hafiz.



29 APRIL 2010

8.15am-9.30am

Task: Update my daily report for previous day (Thursday).

9.30am-12.00pm

Task: Inspection for architecture works. Accompany Mr. Azir. RFI no: ARC 2194/2201/2202/2203/2204/2205

Description: Apply 2nd coat KCC i-floor H2O epoxy coating at chiller plant room, level 1. RFI no: ARC 2194. This coating is for water resistant purpose. Other inspections are more on installation of frame for ceiling.

3.00pm-5.00pm

Task: Attend Design meeting no. 30

Description: The purpose of the meeting is to update on the design progress approvals and related matters. All representatives from each consultant must attend this meeting to present their work progress. The consultants are HMX(Mechanical), Hasbullah Chan Assoc.(Architecture), ORENDA(ICT), TITIJASA(Landscape), MIE(Civil and Structure) and HTA(Electrical).



30 APRIL 2010

8.15am-9.30am

Task: Update my weekly report for previous week by adding attachment.

Description: The report consists of daily works completed for each day.

9.30am-12.00pm

Task: Welcoming the VIP from Ministry of Transport (MOT)

Description: The visit have been attended by Dato’ Seri Ong Tee Keat (Minister of Transport)

2.00pm-4.00pm

Task: Read mechanical services : kitchen exhaust and Ventilation system

Description: The kitchen exhaust are completed with fans, electronic air cleaner, ductwork, kitchen hoods(for food courts). The kitchen exhaust ducting shall be stainless steel of appropriate grade whereby all duct seams and joint shall be airtight with heat resistant and waterproof sealant. The ductwork shall be provided with sufficient opening at elbows and long run duct. For ventilation purpose, there shall be minimum of 85% make up air for proper air circulation. The intake of outside make up air via wall louvers into the kitchen shall be provided by a centrifugal type supply fan.

4.00pm-5.15pm

update my industrial blog